Devon Energy Center

Client:

Holder-Flintco

Location:

Oklahoma City, OK

 

Market:

Commercial

Challenge

Building a 1.8 million square foot, 52-story skyscraper in the middle of a busy downtown is a logistical challenge most contractors never have to contend with. But when Holder Flintco was hired to build the new Devon Energy Center in Oklahoma City, that’s exactly the challenge they faced.

Solution

American Direct was able to not only supply the contractor with more than 900 kinds of hardware, but to deliver it on an only-what’s-needed schedule that kept the compact job site free of inventory that wasn’t ready to be installed. American Direct managed an extremely tight delivery schedule that ensured the product installers would need the next day was delivered overnight and ready for the workers when they arrived in the morning.
“We took the schedule and our given delivery times very seriously so that there was never a problem,” Kellie Volz, American Direct Project Manager for Division 8

Contributors


Wood doors
Eggers

Locks
Schlage

Hinges
Hager

Exit devices
Von Duprin

Pivots
Rixon

Flat goods
Rockwood

Closers
LCN

Traffic doors
Eliason

Aluminum partitions
Wilson partitions

Paper towel dispensers
Dolphin

Soap dispensers
TC Oneshot

Stainless steel doors and frames
Steward Steel

Toilet accessories
Bobrick

Wall protection
Inpro

Mail sorters
Hamilton Sorter

Fire extinguisher cabinets
JL Industries

Toilet partitions
Flush metal

Lockers
Lyon, Republic

Cup dispensers
Dispense Rite

Vault depositories
Kingsley

Robe hooks
Duravit

Amenity jar/tray
Front of the House

3-soap system
Aviva